vinyl siding

 

If you decide to decorate the walls of the house with such material as siding , then you need to familiarize yourself with the general recommendations for installing this material. Vinyl siding is popular for its affordable price and ease of installation. For finishing the basement, you can buy front panels , it is also a great option to use them for finishing the whole house.

Stages of vinyl siding installation process

·        First, you need to calculate the area of ​​the walls that you want to cover with vinyl panels. The easiest way is to break the surface of the walls into simple geometric shapes and sum their area.
Preparatory work, including basic measurements, development of a panel installation scheme, preparation of materials, fasteners and tools necessary for work.

·        Installation of vinyl panels according to the instructions.

·        Installation of soffit panels to ensure ventilation of the space under the roof.

·        The final stage, which includes checking the quality of the work performed and cleaning

Accessories

  1. Siding for exterior cladding;
  2. Beam for the frame or CD-profile;
  3. Window strip;
  4. Outside or inside corners;
  5. Soffit for filing roof overhangs;
  6. Initial profile;
  7. Finishing bar;
  8. H-profile connector;
  9. Drain bar;
  10. J profile.

Tools you may need to install vinyl siding:

  • circular power saw;
  • scissors for metal;
  • cutter knife;
  • transverse saw;
  • perforating pliers;
  • pliers;
  • hammer with a nail puller;
  • screwdriver;
  • square
  • ruler;
  • roulette;
  • building level;
  • rope;
  • pencil;
  • stairs;
  • scaffolding (at high heights).

Preparatory work for the installation of siding

In order for the siding to serve regularly for many years, it must be fastened according to the instructions, making thermal insulation, which will protect the walls from freezing and moisture penetration. All places of contact of siding with brick, plaster, stone, concrete and the space around openings in the wall must be insulated.

 

For facing the facades of a building with a wooden wall covering, it is necessary to replace all damaged and fix loose boards. If necessary, treat the surface of wooden walls with a fire retardant liquid. From the facade, before starting work, you need to dismantle all gutters, ebbs, shutters, lighting fixtures, etc.

Installation of outer corners.

For outside corners, a simpler design is possible – with a simple metal corner that is installed over the panels. In this case, the siding is installed first without a corner, so that the joint of the planes is the most accurate, after which a simple corner is screwed on top. This option is often the most preferable because it is easier and for unprepared people this option seems to be optimal how to install vinyl siding.

Options for joining panels in length.

  • The panel is docked along the length of the overlap of one panel to another, if provided by the siding manufacturer.
  • Joining of panels with a connecting H-strip.

Dimensions, installation, connection features

When facing a house, the correct choice of components is of great importance. The inner and outer corners for siding will simplify the work and give the structure completeness. Such details are broken down into several main categories, used depending on the situation. Installation of extras will not be difficult, provided that simple rules are followed.

Siding is one of the most popular materials for facade renovation, both old buildings, and new homes vinyl siding. In addition to the panels themselves, you need to purchase additional panels in the store, which will greatly simplify and speed up the installation process.

Installation rules

 

In order for the finish to be installed firmly and reliably, you need to strictly follow the installation rules. Each manufacturer provides instructions for their materials. But now we will consider in more detail the installation of the corner profile.

Install the outer corner of the siding, leaving a 6mm distance from the top to the eaves or J-rail. Attach the piece by driving nails into the top holes on either side of the piece vinyl siding.

Setting the outer corner

 

You can then begin installing the fastener (nail, screw, or bracket) at the top of the top perforated hole on both sides of the corner. It should hang vertically on two nails. To take into account the vertical thermal expansion, the following fasteners are installed in the center of the holes 20-40 cm apart, not very tightly.

In this case, the lower part will not protrude from under the siding. If the corner is covered by a cover, the bottom nail strip should be trimmed by 2/3 of the thermal gap, plus the height of the J-profile.

Installation of the outer corner profile: a – general view; b – overlapping; c – the same, through the glue patch; g – the same, through a nail plate; 1 – outer corner profile; 2 – top panel; 3 – bottom panel; n – 1/3 of the temperature gap; t is the height of the final profile (F- or J-); c – distance between fasteners (20-40 cm); d – 2/3 of the temperature gap; e – overlap; f is the temperature gap.